1. Locate the Secondary Power Switch below the Control Panel.

    NOTE: If a certain type of finisher is attached, the power switch will be located behind a clear plastic door.

    Example of Machine with H-Transport

  2. Press the Secondary Power Switch to the Off (O) position and then wait for the Control Panel to go dark.  This may take up to 2 minutes.

    Main power switch

  3. Open the Front Cover.

    Open the Front Cover.

  4. After the Control Panel has gone dark, or if it has not gone dark after 2 minutes, press the Main Power Switch inside the Front Cover to the Off (O) position.

    Power Switch

  5. Wait for at least 1 minute.
  6. After at least 1 minute, press the Main Power Switch to the On (I) position.

    Power Switch

  7. Close the Front Cover.
  8. Press the Secondary Power Switch to the On (I) position.

    Example of Machine with H-Transport